Can Older Overhead Cranes be Retrofitted with Automation?

Wondering if you can upgrade your old overhead crane with automation? Discover how retrofitting can boost efficiency and safety without breaking the bank!

Retrofit automation can extend the life of older overhead cranes. If you've ever used older cranes, you may have wondered if these older cranes could get modern features like remote control, load tracking, etc.? In this article, we explore how crane modernization works in practice. We discuss the key components of a retrofit, the steps involved, and the benefits of equipping a vintage bridge crane with automation.


Introduction to Crane Modernization

Older overhead cranes—sometimes called bridge cranes, EOT cranes, or traveling cranes—may lack modern control and safety systems. Yet these cranes still handle valuable loads day after day. Rather than replace a functional crane structure, many facility managers choose to retrofit automation features. A crane retrofit can include adding a remote control, load tracking, or predictive maintenance sensors. These upgrades transform a manually controlled crane into an automated crane system, boosting safety and productivity.


Why Retrofit Automation on Older Overhead Cranes?

1. Enhancing Safety and Reducing Risks

Why Retrofit Automation on Older Overhead Cranes? Enhancing crane safety and minimizing operational risks can be significantly achieved by integrating remote control systems and load tracking technology. Manual crane operation often involves close proximity to suspended loads, increasing the likelihood of human error, collisions, or dropped materials. By retrofitting a remote control system, operators can work from a safe distance with improved visibility, reducing the chances of standing under a load or striking nearby structures. Complementing this, a load tracking system—also known as a load monitoring device—constantly measures the hoist's tension. If the lifted weight exceeds the crane's rated capacity, the system issues an alert and can automatically cut power to the hoist, effectively preventing overloads. Together, these technologies not only protect personnel and equipment but also preserve the structural integrity of the crane system by preventing excessive force on beams, trolleys, and hoists.

2. Improving Operational Efficiency

Automating key crane functions can dramatically boost operational efficiency by replacing guesswork with precision control and reducing wear on mechanical components. Retrofitting a variable frequency drive (VFD) enables the crane to ramp up and down smoothly, curbing structural stress and shock loads on the hoist rope—thereby cutting maintenance downtime. Integrating a programmable logic controller (PLC) allows common lifting sequences to be stored and executed automatically; for instance, routinely moving loads from point A to point B becomes a single-command operation, shortening cycle times and freeing operators for other tasks.

3. Complying with Updated Regulations

Safety regulations evolve over time. Older overhead cranes may not meet current standards for overload protection, emergency stop requirements, or anti-two-block systems. Retrofitting automation ensures that the crane follows updated OSHA, ANSI, or ISO rules. Installing a load moment indicator (LMI) or anti-two-block switch prevents the hook block from contacting the trolley. This hook collision prevention device aligns the crane with modern safety codes.

Renovation also provides documented proof of compliance. For example, after a crane modernization project, you receive updated test reports for load testing, brake performance, and control panel safety interlocks. These documents satisfy insurance auditors and safety officers.

4. Extending Service Life of a Crane

Legacy cranes often retain robust structural steel, end trucks, and runway rails long after their original controls become obsolete, making a full replacement—which can cost hundreds of thousands of dollars—unnecessarily expensive. Instead, a targeted automation retrofit that adds remote control, load-tracking systems, a programmable logic controller (PLC), and a variable frequency drive (VFD) can rejuvenate an aging crane at a fraction of the cost, extending its service life by five to ten years or more. By focusing on electrical and control upgrades rather than dismantling and rebuilding the entire structure, you preserve the existing runway, beams, and building supports—especially advantageous when steel girders show minimal wear.


Key Automation Features for Legacy Cranes

Remote Control Systems

Remote control for browsers lets operators stand clear of moving loads. A typical wireless crane remote control kit includes:

  • Transmitter (handheld pendant or radio remote).
  • Receiver module mounted in the crane control panel.
  • Control interface to translate joystick or button signals into motor commands.

Remote systems work on 2.4 GHz or 433 MHz frequencies with multiple channels to avoid interference. They include pull-chain cable pendants or stationary pendant boxes as backups.

A remote operation retrofit can also feature jog and inching modes for precise positioning. For example, an adjustable jog button lets the operator move the bridge one wheel circumference at a time. Such refinement is impossible with manual pendant controls.

Load Tracking and Load Monitoring

A load tracking system (or load monitoring device) continuously measures the tension on the hoist rope or chain. Common components include:

  • Load cells or strain gauge sensors on the hoist block or hook.
  • Amplifier to convert the analog signal into a digital display.
  • Control unit that triggers alarms or inhibits hoist motion when overloading.
  • Data logging to record load history for each lift (useful for maintenance records).

By displaying the load weight on an HMI panel or digital indicator, operators know immediately how much weight is on the hook. When the system senses more than 100 % of the crane's rated capacity, it issues a flashing warning light and audible alarm. If the operator ignores the alarm, the load limiter cuts power to the hoist motor and engages the brake.

In addition to preventing overloads, load data tracking can feed into a maintenance schedule. By analyzing peaks and average loads, maintenance teams know when to inspect gears, hoist ropes, or crane beams. This predictive maintenance technique prevents unplanned downtime.

Variable Frequency Drive (VFD) Retrofit

Older cranes often have across-the-line starters or resistor banks to control travel speeds. These methods produce jerky motion and high inrush currents, stressing mechanical components. Upgrading to a variable frequency drive yields:

  • Smooth acceleration and deceleration by ramping voltage and frequency.
  • Energy savings through regenerative braking or reduced idle power.
  • Programmable speeds for bridge travel, trolley travel, and hoist lifting.

A VFD retrofit involves replacing the existing motor starter panel with a compact drive cabinet. Inside, you find:

  • VFD unit sized to match motor horsepower.
  • Control wiring to the motor and control interface.
  • EMC filters to reduce electrical noise on long cable runs.
  • Brake chopper if the motor brake is DC type.

Once installed, the operator can choose travel speeds on an HMI screen or via preset buttons. For example, the crane can run at 100 % speed for long travel and drop to 30 % for fine positioning near racks or machinery. The result is less fatigue on the hoist rope and less stress on the crane bridge.

Programmable Logic Controller (PLC) Integration

A PLC retrofit brings the following advantages:

  • Automated lift sequences: Store common tasks so the crane moves in repeatable patterns—ideal for assembly lines or staging areas.
  • Interlocks: Prevent crane movement unless safety conditions are met, such as clearing a gate or rack.
  • Alarm handling: Display fault codes (e.g., over-temperature, over-voltage, sensor failure) to help technicians troubleshoot quickly.

A typical PLC retrofit includes:

  1. PLC unit mounted in the control panel.
  2. I/O modules for digital and analog signals (e.g., remote control receiver outputs, proximity sensor inputs, load cell input).
  3. HMI touchscreen for operators to select modes (manual, semi-automatic, or automatic) and view system status.
  4. Network connectivity (Ethernet or serial) for data logging and remote monitoring.

With a PLC & HMI retrofit, the crane can integrate into a SCADA system or Crane Management Software. Managers can track crane utilization and load history across multiple cranes. This level of crane automation aligns with Industry 4.0 and smart factory initiatives.

Anti-Sway and Anti-Collision Upgrades

Load sway can be a safety hazard. A hoist anti-sway system uses sensors and drives to dampen load oscillations. Components include:

  • Inertial Measurement Unit (IMU) or sway pendants attached to the hoist block.
  • Control algorithm in the PLC or dedicated controller.
  • Inverter output modulation to apply small corrective motions to the trolley.

This smooths the load's pendulum motion, allowing the operator to place loads precisely. It also reduces cycle time because operators spend less time waiting for sway to subside.

For workshops with multiple cranes, a bridge-to-bridge anti-collision retrofit uses:

  • Ultrasonic sensors, laser rangefinders, or infrared proximity sensors mounted on each bridge.
  • Central controller communicating via wired or wireless network.
  • Control logic that enforces minimum separation distance.

If one crane encroaches into another crane's zone, the system triggers a warning and then slows or stops one crane. This crane collision avoidance upgrade prevents bridge-to-bridge impacts and protects runway rails.

Predictive Maintenance and IoT Sensors

Modern crane automation often includes IoT sensors for predictive maintenance. These sensors monitor:

  • Motor vibration (using accelerometers).
  • Motor temperature (infrared or PT100 sensors).
  • Gearbox oil condition (oil quality sensors).
  • Wheel bearing temperature and lubrication levels.

Data from these sensors goes to a gateway that sends information to the cloud. Software analyzes trends and flags anomalies, such as rising bearing temperature or unusual vibration. Maintenance teams receive alerts to inspect the crane before a breakdown occurs. This condition-based monitoring reduces unplanned downtime and lowers maintenance costs.


Assessing an Older Overhead Crane for Retrofit

Before adding automation, you must assess the crane's current condition. An outdated crane might have hidden issues that need correction before installing new electronics.

Structural Integrity and Load Rating

  1. Inspect the Bridge and Gantry: Check for corrosion, cracks, or bent girders.
  2. Verify Design Load: Confirm the crane's original Safe Working Load (SWL) and check if it matches current lifting needs.
  3. Check Duty Class: Determine if the crane falls under CMAA Class B, C, D, or E. A higher duty class may require heavier-duty components.

If the bridge shows signs of metal fatigue or the rail beams have excessive deflection, you may need to reinforce or replace them before adding automation kits.

Existing Electrical and Control Panel Condition

  1. Review the Control Panel: Open the panel to inspect wiring, fuses, and contactors.
  2. Check Motor Insulation: Use a megohmmeter to test the hoist and travel motor windings.
  3. Assess Power Supply: Ensure your facility can provide stable three-phase voltage (380–480 V) with adequate amperage for new VFDs or PLC units.

If the panel is cramped or wiring is brittle, plan for a control enclosure expansion and replace old wiring to meet current electrical codes.

Crane Bridge, Trolley, and Hoist Review

  1. Examine End Trucks and Wheels: Measure wheel flange wear and bearing play.
  2. Inspect Hoist Rope or Chain: Look for kinks, worn strands, or bent links.
  3. Check Brake Performance: Conduct a brake holding test to confirm the brake pads and drums operate within spec.

If the hoist rope is due for replacement or the brake drums are worn, schedule those repairs first. Retrofitting a load tracking sensor on a brittle rope will give false readings.

Runway and Rail Inspection

  1. Align Rails: Use laser alignment to confirm rails sit within ±1 mm over 10 m.
  2. Inspect Rail Fasteners: Tighten or replace rail clips, fishplates, or welding where needed.
  3. Check Buffer Stops: Test end-travel limit switches and runway buffers under light loads.

Proper runway alignment is key for any sensor-based anti-collision system or position tracking. If rails are uneven, sensors may trigger false alarms.

Step-by-Step Retrofit Process

Retrofitting older overhead cranes with automation involves several phases. Below is a detailed guide for project managers, maintenance engineers, and crane specialists.

1. Site Survey and Needs Assessment

  1. Define Automation Goals: Do you need remote control only, or full load tracking and anti-collision?
  2. Measure Workshop Layout: Note runway length, beam spacing, ceiling height, and floor clearance.
  3. Document Load Profiles: Record the heaviest loads, lift frequencies, and duty cycles.
  4. Identify Safety Gaps: List missing safety devices (e.g., no overload protection or anti-two-block).
  5. Check Utilities: Verify power availability, grounding, and communication infrastructure (Ethernet, fiber, or Wi-Fi).

This survey informs the automation kit design, ensures proper equipment compatibility, and helps estimate project time and cost.

2. Design of Automation Kit and Integration Plan

Engineers use survey data to design the automation package:

  • Remote Control Components: Choose a wireless transmitter, receiver module, and mounting hardware.
  • Load Monitoring System: Select load cells, amplifiers, and digital displays rated for crane capacity.
  • PLC Configuration: Specify PLC model (e.g., Siemens, Allen-Bradley, Mitsubishi) and I/O modules.
  • VFD Specifications: Match drive to motor horsepower, voltage, and braking requirements.
  • Sensor Selection: Pick proximity sensors (ultrasonic, laser) for anti-collision and IMUs or sway sensors for anti-sway functions.

The integration plan includes schematics to show how new devices connect to existing motors, brakes, and wiring.

3. Control Panel Modernization

  1. Remove Obsolete Components: Decommission old contactors, starter relays, and resistors.
  2. Install New Enclosure: If needed, mount a larger electrical cabinet with appropriate IP rating.
  3. Mount PLC and I/O Cards: Rack-mount the PLC, wiring terminals, and fuses.
  4. Add VFDs for Bridge, Trolley, and Hoist Motors: Connect VFDs according to motor nameplate data (voltage, hertz, amps).
  5. Wire Remote Control Receiver: Terminate digital outputs to the PLC digital input cards.
  6. Mount Overload Protection Relays: Wire load cell outputs to an analog input on the PLC.

Use clearly labeled terminal blocks, color-coded wiring, and cable ducts to keep the panel organized. Apply the latest UL or CE standards for panel wiring.

4. Installing Remote Control Hardware

  1. Mount the Transmitter Bracket: Install on a forklift hook or operator station for backup control.
  2. Install the Receiver: Mount the radio receiver inside the crane's trolley or bridge compartment, near the PLC.
  3. Connect Outputs to PLC: Wire receiver relays (e.g., forward, reverse, up, down) to the PLC's digital inputs.
  4. Verify Dead-Man Switch: Ensure the dead-man circuit cuts power to all drives when released.
  5. Test Signal Range: Walk around the workshop to confirm no dead zones.

With the remote in place, operators can control hoist, trolley, and bridge functions from a distance, improving visibility and safety.

5. Integrating Load Tracking Devices

  1. Mount Load Cells or Strain Gauges: Attach to the hoist hook block or fixed point on the rope assembly.
  2. Route Wiring Carefully: Protect sensor cables from snagging on moving parts or heat sources.
  3. Connect to Amplifier and Digital Display: Calibrate the sensor with known test weights to ensure accuracy.
  4. Link the Amplifier to the PLC Analog Input: Program PLC logic to compare load values to SWL thresholds.
  5. Set Alarm and Inhibit Functions: Configure PLC to trigger an alarm relay and cut hoist power when the load exceeds capacity.

Operators now see real-time load weight on a digital display and receive warnings before overloading the crane.

6. Upgrading Drives and Motors

  1. Remove Old Motor Starters or Resistors: Decommission manual or rheostat controls.
  2. Install VFD Units: Bolt each drive to the control panel or external mounting bracket.
  3. Wire Motor Leads: Connect VFD output terminals to motor terminals, using shielded cables if required.
  4. Program Ramp Rates and Speed Limits: Set acceleration/deceleration times and max Hz in the drive parameters.
  5. Test Motor Response: Run the motor at different speeds to verify smooth starts and stops.

Ensure the existing motors are in good condition. Worn bearings or bad insulation may require motor rewinds before VFD installation.

7. Safety System Enhancements

  1. Install Anti-Two-Block Switch: Mount on the hoist block and wire into the PLC digital inputs.
  2. Mount Upper and Lower Limit Switches: Position at proper travel limits to stop over-lift or over-lower.
  3. Add Ultrasonic or Laser Sensors for Anti-Collision: Place sensors on each bridge to monitor gap distance.
  4. Wire Emergency Stop Buttons: Install at operator cabin, ground stations, and on the bridge frame.
  5. Test All Safety Interlocks: Simulate fault conditions (e.g., limit switch open, overload condition) to verify automatic shutdown.

Document each test and keep records of sensor calibration for future audits.

8. Testing, Commissioning, and Training

  1. Conduct No-Load Tests: Run all drives, test remote control functions, and verify PLC logic before lifting any weight.
  2. Perform Load Tests: Lift test weights up to 110 % SWL. Check load cell accuracy and hoist brake performance under load.
  3. Validate Anti-Collision and Anti-Sway Functions: Move two cranes into proximity and observe sensor-triggered slowdowns or stops.
  4. Run Operator Training Sessions: Teach operators how to use the new HMI screens, remote controls, and alarm indicators.
  5. Provide Maintenance Workshops: Instruct technicians on how to interpret PLC fault codes, replace sensor modules, and recalibrate load cells.

With the retrofit fully tested and staff trained, the crane re-enters service as an automated overhead crane system, delivering improved safety and productivity.


Common Challenges and Solutions

Space Constraints in Electrical Rooms

Challenge: Older crane installations often have small control rooms that cannot fit new VFD cabinets or PLC racks.
Solution: Consider remote mounting. Install a sub-panel above the crane bridge or in a corridor. Use compact DIN-rail PLC modules and stackable VFDs to save space. Ensure proper ventilation for heat-generating devices by adding fans or louvers.

Compatibility with Old Wiring and Components

Challenge: Existing wiring may lack proper color codes or have brittle insulation. Some motors may not be VFD-rated.
Solution: Conduct a wiring audit. Replace old conduit runs and cables with new ones rated for VFD use (shielded, 600 V insulation). If motors show bad insulation resistance, rewind or replace them. Use label makers and dry-erase curtains to mark new circuits clearly.

Downtime and Production Interruptions

Challenge: Taking a crane out of service for retrofit can disrupt production.
Solution: Schedule retrofits during planned shutdowns or weekends. Break the project into phases: first install the PLC and remote control system, then retrofit VFDs and load cells. This approach lets you test each subsystem without shutting down the entire crane for extended periods.

Budget and ROI Considerations

Challenge: Budget constraints make it hard to choose between a complete crane replacement and a retrofit.
Solution: Calculate total cost of ownership for both options. Include costs for crane removal, new crane purchase, installation, and downtime. For retrofits, include the cost of parts, engineering, and labor. Compare that to the price difference of a new crane. In many cases, automation retrofits can reduce maintenance costs and increase productivity, but the upfront investment is usually high and may not pay off until a year later.

Balancing Manual and Automated Operations

Challenge: Not all tasks need automation. Some operators prefer manual control for certain lifts.
Solution: Implement a hybrid control mode. The PLC can allow manual pendant control and switch to remote or semi-automatic mode when needed. Use selector switches in the control panel to toggle between manual, remote, and automated sequences. This flexibility keeps operators comfortable while still offering automation benefits when required.

Yuantai Crane

Yuantai Crane

Yuantai, with a decade of crane manufacturing expertise in Changyuan, Henan, operates a facility spanning 240,000 square meters, producing over 10,000 sets annually valued at RMB 1.5 billion. They export top-quality European-style cranes to 150+ countries, serving diverse industries such as steel and petrochemicals.

Contact to Get Solution & Price

Respond quickly to customer needs, questions and create value.

Yuantai Crane are committed to become global expert of crane solution, providing customers with professional crane solutions, make more high-quality lifting equipment serve the world.

Email: [email protected]